Educational Sourcing Guide

How to Start a Private Label Clothing Order with a Manufacturer in Pakistan

A comprehensive technical overview of the private label apparel manufacturing process from initial technical brief to physical sampling, bulk cut-and-sew, and international export shipment.

What is the process for starting a private label clothing order in Pakistan?

Starting a private label clothing order in Pakistan involves six sequential steps: providing a detailed product brief and tech pack, developing prototype samples (7–10 days), reviewing and approving fit and trims, initiating bulk manufacturing (30–45 days), performing in-house quality inspection (AQL 2.5), and dispatching goods under agreed export shipping terms such as FOB Karachi or Air LHE.

Step 1: Preparing Your Manufacturing Brief & Tech Pack

Before approaching an apparel manufacturer, brands must prepare a technical specification document known as a tech pack. A complete tech pack should include:

  • Flat sketches: Front, back, and detail illustrations with stitch placements.
  • Measurement graded specs: Exact dimensions for each size (chest, length, sleeve, rise, inseam).
  • Fabric details: Composition, target GSM weight, weave (e.g. twill, fleece, jersey), and colourway codes.
  • Hardware & trims: Zipper types, button diameters, eyelets, neck labels, care tags, and hangtags.
  • Order quantity breakdown: Volume per style, colourway, and size breakdown. At Al Hassan Apparel, the MOQ is 100 pieces per style per colourway.

Step 2: Prototyping & Sampling (7 to 10 Days)

Once the manufacturer reviews the tech pack, master pattern makers draft paper or digital CAD patterns. A physical sample is stitched by a dedicated sampling cell to verify the cut, silhouette, seam construction, and overall appearance. At Al Hassan Apparel, standard sampling turnaround is 7 to 10 days. For denim styles, initial wash treatments are carried out via a partner wash facility.

Step 3: Sample Fitting & Technical Sign-Off

The prototype is dispatched to the buyer for physical fitting and assessment. The brand checks measurements against the graded spec sheet, evaluates fabric hand-feel, and confirms wash or trim placement. Any necessary revisions are documented. Once both parties agree on the final prototype, an approved counter-sample is confirmed as the baseline for bulk manufacturing.

Step 4: Bulk Cut, Make, and Trim (30 to 45 Days)

Bulk production begins with fabric inspection, computerized laying, and precision cutting. Cut bundles move to synchronized sewing lines where skilled machinists assemble the garments. Standard bulk production lead time is 30 to 45 days. Al Hassan Apparel operating in Lahore, Pakistan, reached an output capacity of 1,000 pieces per day in 2025 across denim pants, denim jackets, outerwear, hoodies, shirts, t-shirts, and knitwear.

Step 5: Quality Assurance & AQL 2.5 Inspection

During and after production, garments pass through in-house quality control. Under international AQL (Acceptance Quality Limit) 2.5 standards, inspectors pull statistical samples from the finished lot to examine stitch density, seam tension, sizing tolerances, hardware security, and packaging integrity before sealing export cartons.

Step 6: Export Dispatch (FOB Karachi / Air LHE)

Finished cartons are prepared with required export labeling and barcode tags. Under FOB Karachi terms, the manufacturer manages origin inland transport to the port of Karachi and handles customs clearance onto the vessel. For urgent drops, Air LHE terms allow dispatch directly from Allama Iqbal International Airport in Lahore. Al Hassan Apparel is currently accepting export orders for brands in the UK, EU, USA, and Gulf countries.

Ready to Submit Your Tech Pack?

Our manufacturing team in Lahore reviews tech packs and provides sample quotes.